Machinery Control Room Temperature Control
A machinery control room fitted with full temperature control, keeping the switchgear at temperature and working as it should.
Breakdown? Engineer on call 24/7
07932 647581Projects
18 recent jobs, from transcritical CO2 and ammonia plant to glass-door retrofits, photographed on site by our team.
A machinery control room fitted with full temperature control, keeping the switchgear at temperature and working as it should.
A full replacement freezer system: supplied, fitted and commissioned, ready to keep the customer's stock at temperature for years to come.
A refrigeration pack removed from one site and reinstalled at another: fully piped, wired, recharged and back in operation.
A run of freezer and air conditioning installs for regular customers, including a freezer now holding −22°C as it should.
Old open-deck cabinets and their condensing unit replaced with glass-door cabinets and a smaller Danfoss inverter-drive condensing unit.
Ducted air conditioning installed for different clients, ready for the summer.
New beer tanks installed and piped in stainless steel into an existing chilled glycol system, with controls wired, set up and commissioned.
A new freezer room, its refrigeration and a new air conditioning system, supplied and installed as a turnkey solution.
A service and check-over of the plant, plus new freezer curtains to keep the freezer running at temperature.
The yearly round of calibrating every temperature probe, completed in house with UKAS certification for audits such as BRC.
Full maintenance on every chill and freezer system at a new factory site, including a compressor replacement and new evaporator fans.
A transcritical CO2 plant tested, charged, programmed and running on RDM controls, with the whole site set up on the front end.
Planned maintenance on a Bitzer plant with a Vacon drive on the lead compressor, EC fans on Güntner condensers and Danfoss controls.
A Bitzer compressor cylinder head stripped down and the valve plates inspected, then everything back up and running.
Several refrigeration packs serviced, with controls and operation checked and adjusted ready for the summer.
A DX CO2 plant serviced: oil changed, system flushed, and back up and running as it should.
A motorised valve fault on an ammonia heat recovery system, got going again and a new valve ordered.
Night blinds fitted to a commercial customer's chilled cabinets, to keep the cold in overnight and cut running costs.
A few smaller jobs we've done too.
A Carpigiani machine: compressor valve plate replaced, new start capacitor and a fresh refrigerant charge, ready for the summer.
Leak testing and pressure testing a twin split AC system to find the leak, then recharging it and getting it running again.
Car air conditioning testing, diagnostics and re-gas.
Toilet ventilation supplied and installed for a customer.
Freezer systems, plant, cold rooms or technical room cooling. Let's talk it through.