The challenge

Switchgear in a machinery control room needed to be kept at a steady, safe temperature so it would keep working as it should.

What we did

  • Designed cooling for the control room
  • Installed the indoor air conditioning unit with neat, clipped pipework
  • Mounted the Mitsubishi outdoor unit outside the room
  • Fitted full temperature control
  • Commissioned and tested the system

The result

The control room is now fully temperature controlled, keeping the switchgear at temperature and working as it should.