Case study: Process cooling

Beer Tanks on Chilled Glycol

New beer tanks installed and piped in stainless steel into an existing chilled glycol system, with controls wired, set up and commissioned.

Type
Process cooling
Completed
September 2024

The challenge

New beer tanks needed connecting to the site's existing chilled glycol system.

What we did

  • Installed stainless steel pipework to the new beer tanks
  • Connected the tanks into the existing chilled glycol system
  • Wired and set up the controls
  • Commissioned the system

The result

The new tanks are cooled from the existing glycol system, with their controls set up and commissioned.